PROCESS PIPING
工艺管道
403 The design of the process piping is performed directly on a model of the project.
工艺配管的设计是直接按照工程项目的一个模型完成的。
404 The model is an actual working tool for piping.
模型是配管用的实际工具。
405 Piping erection work include: prefabrication, placing, aligning, welding and bolting.
管道安装工作包括:预制加工、安置、对准、焊接和连接。
406 Our piping prefabrication workshop covers a total area of 1000m2.
我们的管道预制加工厂拥有一千平方米的面积。
407 We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding.
我们可以对管子进行下列预制加工:切割和机械加工坡口,手工和自动焊接等。
408 The computer generates isometric drawings and prints out bill of materials.
计算机绘出管道空视图,并打印出材料明细表。
409 We shall complete the manhour requirements for the site fabrication (site erection ) of this drawing.
我们将制订这张图纸现场制作(现场安装)所需的工时条件。
410 Seamless steel tube is made in sizes for 1/8 to 24 inches.
无缝钢管制作的尺寸从八分之一寸到二十四寸。
411 Spiral-welded steel pipe is available in sizes from 6 to 36 inches.
螺旋焊接钢管的尺寸从六寸到三十六寸。
412 Two types of end are standard on steel pipes and fittings, that is flanged and screwed.
钢管和管件有两种标准端部型式,即:法兰和丝扣。
413 This pipe is made of carbon steel (stainless steel ,cast iron, plastic).
这管子是碳素钢(不锈钢、铸铁、塑料)制成的。
414 We usually use elbow (bend, flange, tee, reducer) as a kind of pipe fitting.
我们常用弯头(弯管、法兰、三通、大小关)作为一种管件。
415 What is the installation elevation of this pipeline?
这条管线的安装标高是多少?
416 This pipeline will be installed on the No.8 pipe rack .
这条管线将安装于八号管廊架上。